ProductList
Steel pipe series
LSAW pipe Square pipe, rectangular pipe Taper pipe, reducing pipe Thick wall volume pipe Machining pipe Seamless steel pipe Steel structure with steel pip
Tower series
Power tower Radio and TV Tower Communication tower Microwave towers Substation structure bracket Steel pole flare stack bionic tower
Sheet, profile series
Steel plate Angle iron I type steel, H beam, I-beam Channel Round steel
Contact Us

Qingdao Lin Hui Steel Structure Co., Ltd.

Address: Jiutai road No.18 Jiaobei town

Jiaozhou district, Qingdao cityChina

International Department

Tel:86-532-88277806

Fax:86-532-88277556

Sales Manager

Janet Lee

Mobile: 86-136 5639 8235;

E-mail: 

janet.lee@qdlinhui.com 

qdlhgg@foxmail.com

http://qdlinhui.en.alibaba.com







Performance

Home > Performance >

Steel pipe performance

Promulgator: admin    Send date: 2012-07-28 14:36    Visitor:


 

Performance of QingdaoLinhui Steel Structure CO.LTD

1Macao University of Science & Technology Stadium

The construction of Macau University of Science and Technology Gymnasium started in mid-2004, built for the 2007 Asian Indoor Games. The stadium covers an area of 11,400 square meters, can accommodate about 1,500 people. The main steel structure is supported by steel pipes in specifications ф700X50X11800, which is produced by our company , and was high praised by construction unit.

2Shijiazhuang-Taiyuan Railway Line

 Shijiazhuang-Taiyuan railway is the first high-speed railway line inChina, which located in bothHebeiProvince and Shanxi Province. The project was commenced on June 11, 2005, total length of 189 km & design speed of 250 km per hour. It consists of Shijiazhuang North Station, Yangquan North Station&Taiyuan stations. We contracted for the steel tube of Taiyuan Railway Station, Yangquan North Station and other major stations. The main specification of steel pipe is ф620X32,and single length could reach 13.46 meter.

3 The  Stadium Of Zibo City

The stadium, located in Zhangdian District, was built from April 15, 2007 to December 30, 2008.  The construction area is about 60,000 square meters. It can accommodate 45,000 people, which is mainly built for the 11th National Games. Our company carried on the mainly part of steel structure.Conical pipe  ф400-600X20、ф200-300X14 and LSAW pipeф399X10.

4The China Petroleum University Gymnasium

China Petroleum University Gymnasium covers 18,767 square meters, with capacity of 6000 people, which could host the National Games individual sporting events. The main building is 31.4 meters in height. The auxiliary building is 23.8 meters. All of the LSAW pipe and taper pipe came from our company with high quality. Main specifications: ф163-ф242X14, ф167-ф245X6, ф200-ф300X14, ф400-ф600X20, ф399X10.

5Wuhan Qintai Theatre

  

Wuhan Qintai Theatre , invested by the municipal government ofWuhancity, is the main venue of 2007 Eighth China Arts Festival. The  total construction area is 65,650 square meters.We supplied the longitudinal seam welding conical pipe:ф700- ф450X25X10579, ф900 the-ф600X25X13449 ф700-ф450X25X13520 etc.

6Huizhou Stadium

The 2010GuangdongProvincethirteenth Games was held inHuizhouCity. With the approval of the Municipal People's Government, Huizhou Stadium, Jinshan Lake Stadium and Jinshan Lake Swimming and Diving Hall were commenced the construction in November 2006. All of the steel structure, longitudinal pipe & tapered pipe were supplied by our factory and achieved even exceed national standards.Longitudinal pipe & tapered pipe , ф406*12、ф406*16、ф406*20Q345qD steel standard.

7Jinshan Lake Stadium & Jinshan Lake Swimming and Diving Hall

Together with Huizhou Stadium, Jinshan Lake Stadium and Jinshan Lake Swimming and Diving Hall were held for theGuangdongProvincethirteenth Games, with the approval of the Municipal People's Government. We also supplied the longitudinal pipe & tapered pipe at the same time,with specification ф500*20 ,450-400*16,  Q345C steel standard,ф800*50、ф750*60Q345B steel standard.

82400 Tons Crane Ship With Longitudinally Seam Welded Pipe

2400 tons crane ship "Sanhang demeanor hanging force of 2400 tons, the arms frame Change wholly electric crane ship, 96 meters long, 40.5 meters wide and 120 meters long hanging armthe lifting height is the highest in Asia in the same type of boats. All of the longitudinal seam welded pipes used on 2400 ton crane were made by our company.with specificationф1100X24X12500ф1900X24X11000ф1250X24X11500ф900X16X12000. The ship was officially put into use on October 27, 2009. Its first priority is serving the Shanghai World Expo, mainly used for offshore wind power installation and large bridge structure hoisting works.

9Town Lake Tourist Information Service Center

In order to speed up thesuzhouwest tourism function supporting project construction and tourism industrialization process, the hi-tech zone started the construction of first tourist service center - town lake tourist information service center,which is located in the taihu lake,with construction area of 9500 square meters. This project used longitudinally welded pipes , tapered welded pipe that are made by our company production, with specificationф860-ф570X30X14636、ф780-ф520X30X13442、ф870-ф570X30X15689, and the successful completed the task on schedule.

10Guiyang Airport Terminal

Guiyang airport expansion project total investment is 3.64503 billion RMB. Expansion project is divided into two parts, one is the flight assisting, another is the terminal and its auxiliary projects. After a comprehensive study of the construction side of the verification process , the final selection of steel construction fixed our company to supply longitudinally welded pipes and conical tube,specification ф1100-872*45ф900-780*25Q345B steel.

11Qingdao Bay Bridge Project

Qingdao bay bridge also called jiaozhou bay sea-crossing bridge, is the starting point of national highway network G22 Qingdao tolanzhou,with total length 36.48 km,and is the world's longest sea-crossing bridge. To our pride,our company participated the steel structure to supply LSAW welded tube ,ф800*50ф750*60ф1200*50,Q345B steel, for the construction and made our contribution to this highway across the sea.

12Nanchong Jialingjiang Bridge

Jialing river bridge is a single tower asymmetric cable-stayed bridge. The whole bridge with novel and beautiful design, became a magnificent city landscape. Among them our company completed its LSAW steel pipe and highly praised by construction unit, with specification ф406*12ф406*16ф406*20Q345qD steel standard.

Successful cases on steel structure projects by our company is too numerous to mention one by one. In addition to the above performances, there are others like Singapore Marine hoist equipment, Beijing subway line no.5, Tianjin Binhai new area rail transport hub, Dongguan CBA basketball center project, Qingdao railway station expansion project, Jinan railway station, Yantai sports park, TaiYuan Station, the canopy of YangQuan north station, Shijiazhuang passenger railway station steel tube column, Petroleum university and zibo Olympic sports center project, Ocean University gymnasium, etc.

The standard of machining accuracy, welding quality,straightness accuracy of production welded pipe can achieve or even exceed the national standard index in domestic large steel structure industry,our company has widely established good reputation among thousands of construction units, and receives customers’ affirmation.